GENERAL INFORMATION
Date:
2026-07-26
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
16
Total Absent:
3
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
1
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
21.20
โš  Below minimum
10.40 6.40 17.20 โ€”
HC
min: 24T
14.30
โš  Below minimum
8.60 10.40 16.10 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad HA c champer metal solidified
Hand Over Acceptable HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Stopped cv98-20 59 3 4 66 10.6% 4.6% 6.1% metal not enough in melting
6 Running 640-17 75 7 3 85 11.8% 8.2% 3.5% โ€”
7 Breakdown 640-17 87 5 0 92 5.4% 5.4% 0.0% โ€”
14 Stopped 640-16 80 6 2 88 9.1% 6.8% 2.3% metal not enough in melting
16 Stopped 640-16 48 3 7 58 17.2% 5.2% 12.1% metal not enough in melting
TOTAL PRODUCTION 389 โ€”โ€”โ€”โ€”
TOTAL REJECTION 40 10.3% 6.2% 4.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
R69 Completed oil
boro 18' Completed oil
๐Ÿ“
ADDITIONAL REMARKS

no stronuim for degassing