๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-11-04
Day โ€” Team B
TOTAL NDT OK
91
Units
TOTAL HC&FC REJECT
9
Units
H&F REJECTION %
8.57%
of total production
NDT REJECTION %
4.76%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-11-04
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
11
Total Absent:
6
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
3
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 L7 water leaking Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
23.52
โš  Below minimum
4.32 0.00 19.20 โ€”
SWM1 25.77 0.00 1.00 26.77 Alloyment Done.
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 444-18"-4H 66 4 3 73 9.6% 5.5% 4.1% โ€”
7 Running R69-17" 25 5 2 32 21.9% 15.6% 6.3% โ€”
17 Running 444-18"-4h 0 0 0 0 0.0% 0.0% 0.0% โ€”
TOTAL PRODUCTION 105 โ€”โ€”โ€”โ€”
TOTAL REJECTION 14 13.3% 8.6% 4.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
โœ๏ธ Start a New Report