๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-21
Night โ€” Team D
TOTAL NDT OK
209
Units
TOTAL HC&FC REJECT
27
Units
H&F REJECTION %
10.19%
of total production
NDT REJECTION %
10.94%
of total production
DOWNTIME (min)
720
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-21
Shift:
Night
Supervisor:
Ali
Team:
D
Total Attendance:
16
Total Absent:
5
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
7
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Tools in die maintenance not proper to remove metal Medium Risk
2 LPDC 7 More flash Medium Risk
3 Gas cylinder trolly in melting not ok Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
25.26
โš  Below minimum
12.50 8.86 21.62 โ€”
HC
min: 24T
13.86
โš  Below minimum
10.74 12.50 15.62 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running SMX201-22" M7 29 8 13 50 42.0% 16.0% 26.0% High Rej stop 9 PM start 2 AM
5 Running 666-17" 5H 0 0 0 0 0.0% 0.0% 0.0% SG low all wheels out
7 Stopped 640-17" M2 21 2 2 25 16.0% 8.0% 8.0% Stopped 9 PM due to more flash and long run
14 Running SMX201-22" M 4 34 7 5 46 26.1% 15.2% 10.9% Started 11:30 PM
15 Running CV 98-20" M 2 57 4 5 66 13.6% 6.1% 7.6% โ€”
16 Running SMX 201 -22" M 5 68 6 4 78 12.8% 7.7% 5.1% โ€”
TOTAL PRODUCTION 265 โ€”โ€”โ€”โ€”
TOTAL REJECTION 56 21.1% 10.2% 10.9% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
L 6 Ram movement 720 min Infom maintenance NA Maintenance Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17" In Progress UM TBD by Aziz
777-17" Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

No enoph metal recived No enoph metal provided to next shift

โœ๏ธ Start a New Report