2026-07-11
Night โ€” Team C
TOTAL NDT OK
324
Units
TOTAL HC&FC REJECT
9
Units
H&F REJECTION %
2.46%
of total production
NDT REJECTION %
9.02%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-11
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
4
Total Absent:
15
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 area not cleaned above furnace LPDC15 Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
24.80
โš  Below minimum
1.80 0.00 23.00 โ€”
HC
min: 24T
21.30
โš  Below minimum
-2.10 0.00 23.40 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good HA to SWM2 bad ( metal solidify)
Hand Over Good HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running R69-18 84 0 7 91 7.7% 0.0% 7.7% โ€”
5 Running 666-17 5H 54 0 8 62 12.9% 0.0% 12.9% โ€”
6 Stopped 640-17 M1 47 0 7 54 13.0% 0.0% 13.0% โ€”
6 Running 640-17 M2 2 3 0 5 60.0% 60.0% 0.0% โ€”
7 Running boro 60 0 9 69 13.0% 0.0% 13.0% โ€”
15 Standby 777-17 -4H 0 0 0 0 0.0% 0.0% 0.0% โ€”
16 Running R62-18 77 6 2 85 9.4% 7.1% 2.4% โ€”
TOTAL PRODUCTION 366 โ€”โ€”โ€”โ€”
TOTAL REJECTION 42 11.5% 2.5% 9.0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17'' M2 Completed โ€”
640-17 M1 In Progress side mold and upper mold cleaning only
๐Ÿ“
ADDITIONAL REMARKS

Laser marking issues