๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-10
Night โ€” Team C
TOTAL NDT OK
247
Units
TOTAL HC&FC REJECT
22
Units
H&F REJECTION %
7.72%
of total production
NDT REJECTION %
5.61%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-10
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
13
Total Absent:
6
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
27.50
โš  Below minimum
-4.20 0.00 31.70 โ€”
HC
min: 24T
29.40 8.70 0.00 20.70 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good HA to SWM2 bad ( metal solidify)
Hand Over Good HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running R69-18 81 5 2 88 8.0% 5.7% 2.3% โ€”
5 Running 666-17 5H 29 4 0 33 12.1% 12.1% 0.0% โ€”
6 Running 640-17 M1 44 5 7 56 21.4% 8.9% 12.5% Gas hole issues
7 Running 640-17 M2 88 5 7 100 12.0% 5.0% 7.0% โ€”
16 Running R62-18 5 3 0 8 37.5% 37.5% 0.0% โ€”
TOTAL PRODUCTION 285 โ€”โ€”โ€”โ€”
TOTAL REJECTION 38 13.3% 7.7% 5.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
sprue drlling 4 0 min โ€” โ€” โ€” Open โ€”
lpdc17 0 min โ€” โ€” โ€” Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
R62 Completed Sand blasting machine not ok
โœ๏ธ Start a New Report