๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-11-05
Day โ€” Team C
TOTAL NDT OK
174
Units
TOTAL HC&FC REJECT
9
Units
H&F REJECTION %
4.84%
of total production
NDT REJECTION %
1.61%
of total production
DOWNTIME (min)
720
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-11-05
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
13
Total Absent:
3
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
20.23
โš  Below minimum
6.42 6.37 20.18 โ€”
SWM1 19.17 6.37 8.29 21.09 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running segit C3 0 0 0 0 0.0% 0.0% 0.0% start up
7 Running R69-17 82 4 2 88 6.8% 4.6% 2.3% โ€”
17 Running R69-18 92 5 1 98 6.1% 5.1% 1.0% โ€”
TOTAL PRODUCTION 186 โ€”โ€”โ€”โ€”
TOTAL REJECTION 12 6.5% 4.8% 1.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
sprue drlling 2 sensor 6 issue 720 min no action to be fixed maintance Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
C3 Completed โ€”
666 Not Completed lower mold paper wheel removed
โœ๏ธ Start a New Report