๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-23
Day โ€” Team B
TOTAL NDT OK
422
Units
TOTAL HC&FC REJECT
32
Units
H&F REJECTION %
6.58%
of total production
NDT REJECTION %
6.58%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-23
Shift:
Day
Supervisor:
Mohammed
Team:
B
Total Attendance:
10
Total Absent:
8
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running Smx201-22 m7 74 6 10 90 17.8% 6.7% 11.1% โ€”
5 Stopped ROM666-17 53 3 8 64 17.2% 4.7% 12.5% โ€”
6 Running 640-17 54 6 2 62 12.9% 9.7% 3.2% โ€”
6 Running 640-16 70 6 4 80 12.5% 7.5% 5.0% โ€”
7 Running 640-17 m2 82 6 2 90 8.9% 6.7% 2.2% โ€”
15 Running 640-15 4H 89 5 6 100 11.0% 5.0% 6.0% โ€”
TOTAL PRODUCTION 486 โ€”โ€”โ€”โ€”
TOTAL REJECTION 64 13.2% 6.6% 6.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
๐Ÿ“
ADDITIONAL REMARKS

Sand blasting stop need check