๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-16
Day โ€” Team C
TOTAL NDT OK
286
Units
TOTAL HC&FC REJECT
22
Units
H&F REJECTION %
7.03%
of total production
NDT REJECTION %
1.60%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-16
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
15
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Xray door hang broke Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
23.00
โš  Below minimum
0.70 0.00 22.30 โ€”
HC
min: 24T
15.60
โš  Below minimum
-4.40 0.00 20.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good HA to SWM2 bad ( metal solidify)
Hand Over Good HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 91 4 3 98 7.1% 4.1% 3.1% โ€”
6 Running 640-17 91 6 1 98 7.1% 6.1% 1.0% โ€”
7 Running SMX201-22 4 4 0 8 50.0% 50.0% 0.0% โ€”
14 Running R69-18 88 5 1 94 6.4% 5.3% 1.1% โ€”
16 Stopped 666 12 3 0 15 20.0% 20.0% 0.0% wheel formation
TOTAL PRODUCTION 313 โ€”โ€”โ€”โ€”
TOTAL REJECTION 27 8.6% 7.0% 1.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
cv98 Completed โ€”
666 Completed removed wheel
smx201-22 Completed โ€”
โœ๏ธ Start a New Report