๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-05
Night โ€” Team D
TOTAL NDT OK
282
Units
TOTAL HC&FC REJECT
22
Units
H&F REJECTION %
6.79%
of total production
NDT REJECTION %
6.17%
of total production
DOWNTIME (min)
1,440
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-05
Shift:
Night
Supervisor:
Ali Nasser
Team:
D
Total Attendance:
14
Total Absent:
6
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Waste gloves not disposed properly Low Risk
2 Casting Gurds not fixed Medium Risk
3 Tools used in casting consumed and not proper for work Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
31.90 11.37 0.00 20.53 Added 1020 Kg Blocks
HC
min: 24T
24.00 -4.78 0.00 28.78 Transfer from HA 12260 Kg
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running R69.ET40.57 48 4 4 56 14.3% 7.1% 7.1% โ€”
6 Running 640-17" M2 74 8 7 89 16.9% 9.0% 7.9% Rework done 30 Min
7 Running 640-17" M1 85 5 4 94 9.6% 5.3% 4.3% โ€”
16 Stopped 666-18"-5H 75 5 5 85 11.8% 5.9% 5.9% โ€”
TOTAL PRODUCTION 324 โ€”โ€”โ€”โ€”
TOTAL REJECTION 42 13.0% 6.8% 6.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LPDC1 7 Mechanical 720 min Reported NA Maintenance Open BD from last month
EOT casting Not running 720 min Reported NA Maintenance Open BD from morning
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
SMX201-22" Completed Done- Oil
๐Ÿ“
ADDITIONAL REMARKS

-Most of the rejection is due to poor riser tubes is not available in store -HA MMEI Pump spare not available -No Vortex Impeller Spare also - LPDC 17 BD since long time

โœ๏ธ Start a New Report