๐Ÿ  Overview โ€บTeam C
FOLLOW-UP SCORE
7
3 findings
Shifts
1
77 Machine Runs
Rejection %
5.7%
plant avg 6.8%
OEE
71.5%
plant avg 69.7%
๐Ÿ“‹
Team C โ€” What to follow up on
๐Ÿ‘ค Julanda
โฑ
Downtime cause concentrated in this team ๐Ÿ”ด High
Over Cycle Time โ€” 310 min (51% of plant total)
This team accounts for 51% of all "Over Cycle Time" downtime in the plant. Because the other teams do not share it at this level, it is likely a practice or handover issue rather than an equipment fault.
โฑ
Downtime cause concentrated in this team ๐ŸŸก Medium
Metal Pouring & Dross Cleaning โ€” 800 min (36% of plant total)
This team accounts for 36% of all "Metal Pouring & Dross Cleaning" downtime in the plant. Because the other teams do not share it at this level, it is likely a practice or handover issue rather than an equipment fault.
๐Ÿญ
Underperforming on a shared machine ๐ŸŸก Medium
M/C No. 5 โ€” Rejection % 5.9% vs 5.6% ยท OEE 49% vs 65%
On machine 5 (6 runs) this team rejects 5.9% against 5.6% for other teams on the SAME machine. Same equipment, different result โ€” so the gap points to method, not the machine.
๐Ÿ‘ท
Team Operators
Each operator against the rejection expected for the models they actually ran
EmployeeMachine Runs TOTAL PRODUCTIONACTUAL REJECTION EXPECTED REJECTIONDifference Status
Hamad Said Hamad Al Mamari 19 1,064 7.6% 6.6% +1.0 โœ“ as expected โ€บ
Redah 12 816 6.6% 7.0% -0.4 โœ“ as expected โ€บ
Mohammed Abdullah Al Balushi 11 835 4.4% 5.3% -0.9 โœ“ as expected โ€บ
Musaab Said Al Balushi 16 959 7.0% 8.4% -1.5 โœ“ as expected โ€บ
Mohammed Khamis Al Risi 20 1,481 3.8% 5.9% -2.1 โญ better than expected โ€บ
๐Ÿ“‰
Weakest Shifts
Lowest OEE shifts for this team โ€” open one to see the machine detail
DateShiftMachines TOTAL PRODUCTIONRejection % Total DowntimeOEE
2026-07-08 Day 6 355 6.2% 150 60.2% ๐Ÿ”
2026-07-02 Night 6 294 5.8% 70 61.0% ๐Ÿ”
2026-07-03 Night 4 158 9.5% 60 62.7% ๐Ÿ”
2026-07-19 Night 5 354 7.3% 430 63.8% ๐Ÿ”
2026-07-01 Day 5 267 4.5% 150 69.2% ๐Ÿ”
2026-07-11 Night 6 387 8.5% 460 72.0% ๐Ÿ”