Which team needs attention, in which area, and with whom — with the evidence behind each finding
| Model | Machine Runs | TOTAL PRODUCTION | Their Rejection | Model Baseline | Difference | OEE |
|---|---|---|---|---|---|---|
| Style 640-17 5H | 8 | 435 | 7.8% | 5.0% | +2.8 | 67% |
| Style 640-16 5H | 3 | 246 | 8.1% | 6.3% | +1.8 | 77% |
| Style 640-15 4H | 2 | 197 | 9.1% | 11.5% | -2.4 | 77% |
| 666-17 5H | 4 | 172 | 4.7% | 5.5% | -0.8 | 56% |
| 444-17 5H | 1 | 9 | 11.1% | 6.1% | +5.0 | 21% |
| 666-18 5H | 1 | 5 | 0.0% | 6.6% | -6.6 | 31% |
| M/C No. | Machine Runs | TOTAL PRODUCTION | Rejection % | Total Downtime | OEE |
|---|---|---|---|---|---|
| 6 | 8 | 435 | 7.8% | 290 min | 67% |
| 5 | 5 | 181 | 5.0% | 365 min | 49% |
| 16 | 3 | 246 | 8.1% | 80 min | 77% |
| 15 | 3 | 202 | 8.9% | 50 min | 61% |
| Reason | Minutes | Share of Downtime |
|---|---|---|
| Rework systemic | 300 min | 38.2 |
| Metal Pouring & Dross Cleaning | 260 min | 33.1 |
| Metal Delay | 70 min | 8.9 |
| Elec | 65 min | 8.3 |
| Startup Loss / Specific Gravity Issue (min) | 60 min | 7.6 |
| Trouble Shooting | 30 min | 3.8 |