๐Ÿ“„
Previous Shift Report
Review the last shift before starting your report โ€” improves handover. 2026-11-02 ยท Day ยท Team A
๐Ÿ‘๏ธ View Previous Shift
๐Ÿ“‹
GENERAL INFORMATION
โš ๏ธ
SAFETY OBSERVATIONS
No Observation Status
1
2
3
๐Ÿ”ฅ
FURNACE STATUS
Minimum thresholds โ€” HA: 28T ยท HC: 24T
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
HC
min: 24T
SWM1
SWM2

๐Ÿ’ก Mass End of Shift is calculated automatically: Mass End = Received โˆ’ Consumed + Metal Added

๐ŸŒŠ
LAUNDER CONDITION
Stage Condition Comments
Received
Hand Over
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
TOTAL PRODUCTION 0 โ€”โ€”โ€”โ€”
TOTAL REJECTION 0 0% 0% 0% โ€”

๐Ÿ’ก Select M/C No. from the dropdown (1โ€“20). Empty rows will not be saved.

๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/C Issue DownTime (min) Action Taken Pending Action Responsible Status Odoo Notification
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die Model Status Remarks
๐Ÿ“
ADDITIONAL REMARKS
Optional โ€” any extra notes about this shift

All data will be saved to the database